Add Favorite
WeChat
Hi,Welcome To ENEJEAN Hotoline:8620-36548602 Sitemapsitemap Chinese
Select Language
Thai
Indonesian
Korean
Japanese
Vietnamese
Malay
Russian
Filipino
French
German
Portuguese
Hindi
Xhosa
Arabic
Burmese
Cambodia
Lao
China
Italian
Spanish
Dutch
Greek
Turkish
Bengali
Persian
Poland

Current position:Home->Product display->Laundry Solution Design->Large Laundry Solutions

Large-scale Water Scrubbing Laundry ( Steam ) Allocation Plan C
  • Large-scale Water Scrubbing Laundry ( Steam ) Allocation Plan C
  • Model Number:
  • Certification:
  • Construction:
  • Function:
  • Used for:
  • Packaging Details:
  • Delivery Detail:
  • Inquire Online

ENEJEAN LAUNDRY
Large-scale Water Scrubbing Laundry ( Steam ) Allocation Plan C
 
                               device name
Model
quantity
               price
full suspension full automatic frequency conversion washer extract
XTQ-70
2
 
full suspension full automatic frequency conversion washer extract
XTQ-100
2
 
automatic temperature control dryer
QHQ-100
2
 
automatic temperature control dryer
QHQ-70
1
 
automatic temperature control dryer
QPZQII3000
2
 
folding machine
QD-3000
1
 
full automatic portrait machine
ZDR-Y
1
 
pressing machine
QZT-A1
1
 
luxury energy-saving flat ironing table
QPZQQQ1500A
5
 
iron
(safety iron with push-button)
5
 
Presented
item
quantity
item
quantity
                   trolley
5
copper medal
1
 clothing box
10
waistcoat
25
clothing barrel
7
chest card
25
clothes hanger
70
rubber footwear
10
panel
4
washtub
8
Project requirement
1.    site areaabove 1000 square meter
2.    Site requirements:380V power supply, plentiful source of water, warehouse workshop with convenient water inflow and drainage.
3.    energy consumptionsteam consumption around 1000kg for each time
4.    Configuration of the boiler: More than 1 tons of boiler, the pressure reach 0.4-0.6Mpa.
5.    electricity demandabove 380V 60A electricity meter
6.    ironing speedabout 26-30m/min (800pcs bed sheet or 600pcs quilt cover for each hour)
7.    personnel allocation  : above 30
8.    Daily linen treatment capacity( 8 hours )about 5000KG

Messages
Name: Communication email:
Content: